This store requires javascript to be enabled for some features to work correctly.
-
Cut off for READY TO SHIP pieces Worldwide is 12/12/2025
-
USA & CANADA Christmas Order CUTOFF 11/1/2025 for all BUILD YOUR OWN AND MADE TO ORDER PIECES
-
INTERNATIONAL Christmas Order CUTOFF 10/15/2025 BUILD YOUR OWN AND MADE TO ORDER PIECES
-
Current Lead Times for Made to Order & Build Your Pieces is 7-8 Weeks
Tiny golden leaf chevron set with your choice of natural Oregon Sunstone pear (approx. .20cts each)
The pear setting is 7.5mm's wide and the band is about 2mm's. The opening is about 5mm's wide and about 3mm's deep.
-
This piece is MADE TO ORDER. Current turnaround times are located at the top and bottom of the page.
-
Handcrafted in our second-generation family workshop in Portland, Oregon.
-
Made with conflict-free gemstones and recycled metals.
-
Our metals are nickel-free and never plated.
-
Every order includes a branded box and a SwankMetalsmithing jewelry polishing cloth.